Turku Waste-to-Energy Plant
Consulting services for an old and a new Waste-to-Energy Plant for Turun Seudun Energiantuotanto, Finland.

Description of project:
New waste-to-energy plant with a capacity of 145 000 t/year.
Fuel and slag handling; grate boiler (50 MWf); semidry fluegas system; turbine; BOP; civil works; electrification; automation and DCS system.
ÅF's services:
1993 - 94:
- Implemented refurbishment and modification for waste-to-energy plant
2001:
- Feasibility study (grate and fluidised bed were evaluated)
- Environmental Licensing
- Pre-engineering, tender evaluation and preparation of contracts for main equipment