Edinburg Waste-to-Energy Plant
ÅF performs detailed engineering of newly built plant that will serve the cities of Edinburgh and Midlothian in the UK.

Client: HZI Inova
Solution: Detailed engineering of new WtE Plant
Project period: 2016–2018
- Hitachi Zosen Inova, a leading EPC turnkey supplier for environmental systems and plants, is building a plant that will handle around 155,000 tonnes of non-recyclable municipal solid waste every year, and will be capable of supplying electricity up to some 32,000 households. source: hz-inova.com.
- ÅF’s assignment is to perform extended basic and detailed engineering of water-steam cycle part. This includes piping and secondary steel structure design of ca. 600 pipelines and stress analysis of critical pipes.
Photo by http://www.hz-inova.com