Ruppoldingen Hydro Power Plant
Replacement of run-of-river canal scheme HPP and river renaturing in Switzerland

Description of projec:
The plant, built in 1895 on a side canal of the Aare River, has been replaced by a new 23 MW run-of-river power plant. The new concept allows energy production to be almost tripled. Extensive ecological measures improve the natural environment in the immediate vicinity of the plant.
ÅF's services:
- Overall project management;
- Project design;
- Site supervision and commissioning;
- Responsible for ensuring an environmentally compatible realization of the project;
- Comprising construction of the new plant and dismantling of the former plant.