Kainji & Jebba HPP
Hydro power rehabilitation project in Nigeria

Project description Kainji:
- Status of project: Preparation of tender documents
- Construction: 1964 - 1976
- Dam: Rockfill 63, high, 4,200 m long
- Reservoir capacity: 15 Bn. m3
- Head: 24 to 42 m
- Number/Type of units: 8 Kaplan
- Total capacity of 750 MW
Project description Jebba:
- Status of project: Preparation of tender documents
- Construction: 1984
- Main-dam: 29 m high, 650 m long
- Reservoir capacity: 3.9 Bn. m3
- Head: 28 to 29 m
- Discharge: 385 m3/s
- Number/Type of units: 6 Propeller
- Total capacity of 578 MW
ÅF's services:
- Review the detailed technical due diligence carried out by TSP
- Review of capacity recovery Plan (CRP) carried out by TSP
- Review the work plan (timetable) proposed by the TSP to implement the CRP
- Prepare an initial technical evaluation report
- Review and recommend the MESL Board to approve the tender documents
- Recommend a ranking of awardees to the board
- Evaluate the bids received
- Inspection/supervision of works
- Supervise the equipment commissioning
- Full time engineer in each plant with office support