Högbytorp Waste-to-Energy Plant
Owner’s Engineering services for a new waste-to-energy cogeneration unit in Sweden.

Client: EON Värme Sverige Ab
Plant description: Grate boiler, Cranes, Dry slag handling, semidry flue gas system + FG condenser, WWTP, Turbine.
Capacity: 100 MWf, 300 000 t/a
Schedule: 2015-2020
ÅF's scope of services:
- Concept design and main equipment tendering incl. tender evaluation and preparation of contracts
- DH network design
- FGT +WWTP: project management, delivery and erection control and coordination, test on completion and performance test.