Yeywa HPP
Comprehensive design and management services in the development of an RCC dam and 800 MW HPP in Myanmar

Description of project:
The Yeywa project is designed to make use of the hydropower potential of the Myitnge River. Key features of this project are a 137 m high RCC dam, a powerhouse with four 200 MW turbine-generator sets, the transformer station, and a 230 kV switching station.
ÅF's services:
- Site selection studies
- Conceptual design of the civil works and equipment, as well as assistance with the tender design
- Project planning
- Final and detailed design of all civil structures, built directly by the Client
- Final design and preparation of the tender documents for the equipment of the plant
- Supervision of construction commissioning.