Seli HPP
Feasibility studies in India

Description of project:
- RoR scheme on River Chenab
- Dam 123 m high & 189.5 m long
- 6 gated spillway 16 m x 18 m
- 2 circular HRTs of total length 8.3 km and dia 8.4 m
- Vertical underground surge shaft of 51 m height
- 4 pressure shafts of total length 0.9k m long and of dia 4.6 m
- Underground powerhouse of size 100m x 20m x 39m
- 4 Francis Turbines 100 MW each (total capacity 400 MW)
- 4 TRT 5.95 m dia
ÅF's services:
- Preparation of a bankable DPR (Feasibility study report) comprising the following:
- Review of surveys & recommendation of additional survey
- Review of geotechnical investigations and recommendation of additional investigations
- Geological mapping of the project area & of main project components
- Construction material studies & project optimization
- Seismological Studies and recommendation for site specific seismic study report
- Reservoir simulation studies & sedimentation studies
- Power potential & Power system studies as well as project implementation schedule
- Basic design of project components for civil works, Hydro-mechanical works and E&M works
- Construction and equipment planning of project
- Preparation of cost estimates and financial evaluation of project