Baluchaung 3 HPP
Comprehensive consulting and engineering services for a new HPP in Myanmar

Description of project:
The Baluchaung No. 3 HEPP (BLC3) is the third, downstream stage of a cascade development of three hydro power projects on the Baluchaung River and is located in Kayah State some 25 km southeast of the state capital of Loikaw in Myanmar.
ÅF's services:
Review of the feasibility study; preparation of the tender design and specification; assistance during tender evaluation and contract negotiation; civil construction design; assistance during the construction at site; review of the E&M design document; review and improvement of the environmental and social assessment report and preparation of the application for CDM.