Stena Recycling
Recycling of metals

History
Stena decided to build a new plant for recycling of metals in Halmstad Sweden. ÅF first performed a prestudy for the complicated productions processes and was then assigned to develop the new Manufacturing Execution System (MES). The plant are recovering metals from scrap material and need a production system to keep track of matierial for production, economic follow up and inventory control.
Project
The Stena MPS are developed and configurated on the ÅF MES Platform. The ÅF MES have been developed during serveral earlier project and continously updated with modern technique. The project started in the beginning of 2016, and the first stages was commissioned early in 2017 together with equipment and machinery.
Result
The plant are today one of the most modern in its kind and are now developed and trimmed. Stena are now having full control of the production process throught the Stena MPS productions system.
Image: Stena Recycling