This website uses cookies to improve your browsing experience and the continued use of the webpage indicates your consent to ÅF’s use of these cookies. Find out more about how ÅF uses cookies and how you can manage them here: Read more

Menu
Referens

SHPP Schils

Conception Studies and Basis Design for the rehabilitation of the 4 SHPPs of EW Schils in Switzerland.

Description of project:

In 2015 ÅF finished the conceptual feasibility study for the rehabilitation of the small power plants of EW Schils. These power plants consists of 8 various turbines in 5 different places with a total capacity of 8.4 MW. Further the systems contents a storage with a volume of totally 40’000 m3, various penstocks and a surge chamber.

ÅF investigated in total 7 concepts with the goal to increase electricity production as also to simplify the total system in a cost efficient manner. Hereby we used a multi-criteria analysis. Finally ÅF has presented a concept, which reduces the total system to two power plants with a total capacity of 10.2 MW and an increased annual production of 44.3 GWh (plus 13 %).

ÅF has been assigned to prepare the preliminary design study for the chosen concept.

ÅF's services:

  • Feasibility Study for Rehabilitation and Capacity Increase
  • Basic design

Mer på samma ämne

Visa fler