Kenertec and Hudigm Power Plant

Modification of 130 t/h PC boiler with back pressure turbine to BFB for biofuels, sludge and RDF in South Korea.

Project description:

Modification of 130 t/h PC boiler with back pressure turbine to BFB for biofuels, sludge and RDF.

Project period: 2007 - 2009

ÅF's services:

  • Pre-Engineering for local detailed engineering and purchasing of new fuel handling, new convective boiler
  • New Air and FGR system, New Flue Gas Cleaning
  • New Ash Handling system, DeNOx by SNCR
  • New Combustion Control, Turbine modifications
  • Detailed Engineering for the rebuilding of the existing PC boiler to BFB
  • Commissioning