Sadmeli HPP
Feasibility studies in Georgia

Description of project:
- Feasibility stage, Run-of-River scheme
- Main headworks on Rioni River
- Additional catchment Lukhoni River
- Daily storage with 8 hours peaking operation
- 13 km long headrace tunnel 6.4 m dia
- Gross Head: 144 m, design discharge 120 m3/s
- 2 X 67.5 MW Francis units, annual production 617 GWh
- Total investment costs estimated 260 mEUR
ÅF's services:
- Pre-feasibility study
- Feasibility Study including:
- Evaluation of several alternatives
- Analysis of natural hazards
- Power production analysis
- Recommendations to investor