Kainji & Jebba HPP

Rehabilitation in Nigeria

Project description Kainji:

  • Status of project: Preparation of tender documents
  • Construction: 1964 - 1976
  • Dam: Rockfill 63, high, 4,200 m long
  • Reservoir capacity: 15 Bn. m3
  • Head: 24 to 42 m
  • Number/Type of units: 8 Kaplan
  • Total capacity of 750 MW

Project description Jebba:

  • Status of project: Preparation of tender documents
  • Construction: 1984
  • Main-dam: 29 m high, 650 m long
  • Reservoir capacity: 3.9 Bn. m3
  • Head: 28 to 29 m
  • Discharge: 385 m3/s
  • Number/Type of units: 6 Propeller
  • Total capacity of  578 MW

ÅF's services:

  • Review the detailed technical due diligence carried out by TSP
  • Review of capacity recovery Plan (CRP) carried out by TSP
  • Review the work plan (timetable) proposed by the TSP to implement the CRP
  • Prepare an initial technical evaluation report
  • Review and recommend the MESL Board to approve the tender documents
  • Recommend a ranking of awardees to the board
  • Evaluate the bids received
  • Inspection/supervision of works
  • Supervise the equipment commissioning
  • Full time engineer in each plant with office support