Pre-feasibility and detailed project reports, and tendering services in Macedonia

Description of project:

Design and construction of a 70 MW hydro power plant in Macedonia, including a dam (RCC 33 m high, 250 m long), 10 km headrace tunnel, 6 intakes with 3 siphons and 20 km channels, penstock (head 357 m), powerhouse (Francis turbines and vertical generator), and a 110 KV switchyard. The project is financed EBRD.

ÅF's services:

Design and procurement hydromechanical parts (valves and penstock); design and procurement 110KV switchyard; EISA monitoring plan and support during project implementation and post-completion.