Vasileostrovskaya Power Co. JSC, St Petersburg, Russia
Construction is to take place at the territory of Vasilyevskiy Island in St Petersburg. Works performed by Lonas Tekhnologia CJSC (AF, St Petersburg) within the project of constructing a new combined cycle power plant covered:
- Pre-feasibility studies
- Designing project of reducing sanitary-protection zone
New 350 MW CCGT plant provides generation of electrical power and a 80 MW heating power. The project was completed in 2008 but construction has not yet started.