EIA for the Transmission Line AMET, Switzerland
Description of project
The power transmission line Amsteg-Mettlen built in 1948/49 required rehabilitation due to progressive corrosion. For the 27 km long section between Sisikon and Dierikon, and the replacement of 85 poles, an assessment was prepared in accordance with Swiss law.
Our services
Preparation of Environmental Impact Assessment (EIA); project management, as well as investigation and assessment of different environmental aspects. Based on the EIA, measures were defined to minimize the environmental impact and were implemented during construction.