Change language to English Sprache ändern in Deutsch
Share |

Feasibility Studies HPP, East Europe/Central Asia

Feasibility Studies HPP, East Europe/Central Asia

Feasibility Studies HPP, East Europe/Central Asia

Description of project
Project studies for alternative solutions in Albania, Turkey and Georgia with the
main goal to optimize the harnessing of the hydropower potential based on given catchment areas. The installed capacity ranges from 50 to 450 MW and the annual energy production from 225 to 1,000 GWh.

Our services
Site visit; data collection; optimizing the harnessing of hydropower potential; reservoir simulation; optimization of water conveyance systems; cost estimation; energy production and power potential studies.

Feasibility Studies HPP, East Europe/Central Asia
Tel: +46 10 505 00 00 Adresser
Innovation by experience