Feasibility study of six power substations

Substations and transmission lines in the Ukraine

ÅF's services: 

  • Feasibility study for the rehabilitation of six power substations (295 m$ investment), including an estimation of the rehabilitation costs and the preparation of the bidding documents for the execution of the works and the equipment supply.
  • Feasbility study for the improvement of reactive power compensation in the grid (5 m$ investment): calculation of the compensation needs, selection and location for the reactive power compensation devices and suitable points of connection.