500 kV Power Transmission Project Agadyr–YuKGRES

Project support in Kazakhstan

Description of project:

  • 500 kV transmission line “500 kV Agadyr substation - 500 kV YukGres substation”, 390 km (Section 3 of entire 500 kV North–South Power Transmission Project, 1115 km)
  • Extension corresponding to connections of 500 kV outdoor switchgear at 500 kV Agadyr substation and 500 kV outdoor switchgear at 500 kV YukGres substation
  • Installation of reactive compensation by means of shunt reactors

ÅF's services:

Technical Due-Diligence, appraisal of:

  • Project rationale, feasibility
  • System studies: load flow, short circuit, voltage level, net capacity increase, system losses
  • Environmental impact and assessment, classification, mitigation measures, action plan
  • Design criteria
  • Line routing and tower spotting
  • Cost estimate
  • Project time schedule
  • Disbursement schedule
  • Project implementation plan
  • Land acquisition, right of way
  • Procurement strategy, procurement plan
  • Project implementation organisation
  • Project risks
  • Terms of reference for project implementation unit