115 and 20 kV Transmission and Distribution Project

Supplying electricity to selected areas of northern Lao PDR by extending the country’s northern power grid

Components of project:

The project consists of the following features:

  • 164 km of 115 kV transmission line from Nam Leuk to Phonsavan, extension of Nam Leuk HPP substation, 115/22 kV substation at Phonsavan, shieldwire distribution for villages along the transmission line and conventional distribution in Phonsavan and Muang Cha towns and the surrounding areas
  • 76 km of 115 kV transmission line from Xieng Ngeung to Xayabury, 115 kV-T-off at Xieng Ngeun, 115/22 kV substation at Xayabury, shieldwire distribution for villages along the transmission line and conventional distribution in Xayabury center and surrounding areas
  • 45.6 km of 22 kV transmission line from Thalat substation to Ban Don, shieldwire distribution for villages along the transmission line, 115 kV/22 kV substation in Ban Don and conventional distribution in Muang Feuang district
  • 54.4 km of 115 kV transmission line from Ban Don to Non Hai, shieldwire distribution for villages along the transmission line, 115/22 kV substation in Non Hai and conventional distribution for Non Hai area, villages from Non Hai to Xanakham, Xanakham town, and villages from Xanakham to Muangkhi
  • 130 km of 22 kV distribution lines, 4990 kVA installed distribution transformer substations capacity and about 5100 low voltage connections in Vientiane Plain

ÅF's services:

  • Project management
  • Power transmission
  • Distribution
  • Substations
  • Environment
  • Socio-economic and
  • UXO Clearing
  • Site supervision
  • Monitoring Schedule of performance