Reference

Yeywa HPP

Comprehensive design and management services in the development of a RCC dam and 800MW HPP in Myanmar

Description of project:

The Yeywa project is designed to make use of the hydropower potential of the Myitnge River. Key features of this project are a 137 m high RCC dam, powerhouse with four 200 MW turbine-generator sets, the transformer station, and a 230 kV switching station.

ÅF's services:

  • Site selection studies;
  • Conceptual design of the civil works and equipment, as well as assistance with the tender design;
  • Project planning;
  • Supervision of construction commissioning.