This website uses cookies to improve your browsing experience and the continued use of the webpage indicates your consent to ÅF’s use of these cookies. Find out more about how ÅF uses cookies and how you can manage them here: Read more

Menu
Reference

Upper Paunglaung HPP

Feasibility study, and design and construction services for a hydropower project in Myanmar

Description of project:

The Upper Paunglaung hydropower project is owned by the Ministry of Electric Power Myanmar and comprises a 103 m high RCC (roller compacted concrete) dam with a 140 MW powerhouse located on the left bank at the foot of the dam. The ungated spillway is located in the central section of the dam. The existing Paunglaung HPP will benefit from the new larger reservoir created by this project, with an increased power production.

ÅF's services:

  • Feasibility study;
  • Basic design;
  • Construction design of the civil works;
  • Construction supervision for RCC, CVC and EM installation.

More on the same topic

Show more