This website uses cookies to improve your browsing experience and the continued use of the webpage indicates your consent to ÅF’s use of these cookies. Find out more about how ÅF uses cookies and how you can manage them here: Read more

Menu
Reference

Shweli 3 HPP

RCC Gravity Dam in Myanmar

Description of project:

  • Tender design / Detail design
  • Dam: RCC gravity
  • Dam height: 120 m
  • 40 m high saddle dams
  • Reservoir capacity: 5,500 Mio. m3
  • Gated spillway with design flood of 7,300 m3/s
  • 4 penstocks with diameter 7.8 m
  • Units: 4 francis turbines with total capacity of 1,060 MW
  • AIS switchyard
  • Average annual total energy production: 3,400 GWh/year

ÅF's services:

  • Site reconnaissance missions
  • Review of prelim. feasibility study, hydrology and geology
  • Elaboration of feasibility study and report, incl. environmental, social impact and resettlement issues
  • Preparation of specifications for hydraulic model tests
  • Elaboration of basic design, report and drawings
  • Construction planning and equipment
  • Detail design /Construction design
  • Site supervision

More on the same topic

Show more