  • RoR scheme on River Chenab
  • Dam 123 m high & 189.5 m long
  • 6 gated spillway 16 m x 18 m
  • 2 circular HRTs of total length 8.3 km and dia 8.4 m
  • Vertical underground surge shaft of 51 m height
  • 4 pressure shafts of total length 0.9k m long and of dia 4.6 m
  • Underground powerhouse of size 100m x 20m x 39m
  • 4 Francis Turbines 100 MW each (total capacity 400 MW)
  • 4 TRT 5.95 m dia

ÅF's services:

  • Preparation of a bankable DPR (Feasibility study report) comprising the following:
  • Review of surveys & recommendation of additional survey
  • Review of geotechnical investigations and recommendation of additional investigations
  • Geological mapping of the project area & of main project components
  • Construction material studies & project optimization
  • Seismological Studies and recommendation for site specific seismic study report
  • Reservoir simulation studies & sedimentation studies
  • Power potential & Power system studies as well as project implementation schedule
  • Basic design of project components for civil works, Hydro-mechanical works and E&M works
  • Construction and equipment planning of project
  • Preparation of cost estimates and financial evaluation of project

 