Reference

Sadmeli HPP

Feasibility studies in Georgia

Description of project:

  • Feasibility stage, Run-of-River scheme
  • Main headworks on Rioni River
  • Additional catchment Lukhoni River
  • Daily storage with 8 hours peaking operation
  • 13 km long headrace tunnel 6.4 m dia
  • Gross Head: 144 m, design discharge 120 m3/s
  • 2 X 67.5 MW Francis units, annual production 617 GWh
  • Total investment costs estimated 260 mEUR

ÅF's services:

  • Pre-feasibility study
  • Feasibility Study including:
  • Evaluation of several alternatives
  • Analysis of natural hazards
  • Power production analysis
  • Recommendations to investor 