Ruppoldingen Hydro Power Plant

Replacement of run-of-river canal scheme HPP and river renaturing, Switzerland

Description of projec:

The plant, built in 1895 on a side canal of the Aare River, has been replaced by a new 23 MW run-of-river power plant. The new concept allows energy production to be almost tripled. Extensive ecological measures improve the natural environment in the immediate vicinity of the plant.

ÅF's services:

  • Overall project management;
  • Project design;
  • Site supervision and commissioning;
  • Responsible for ensuring an environmentally compatible realization of the project;
  • Comprising construction of the new plant and dismantling of the former plant.