Pala Maneri Hydro Power Project

Initial project review and preparation of detailed project report for a 480 MW HPP in India

Description of project:

Pala Maneri Hydro Power Project (480 MW) is a run-of-river scheme on the Bhagirati River located in Uttarakashi District of Uttarachal about 180 km upstream from Rishikesh.

The project comprises a concrete gravity dam, an intake on the right abutment, three underground desilting chambers, a headrace tunnel, two steel lined pressure shafts and a vertical surge shaft. The pressure shaft feeds the underground powerhouse which houses 4 Francis units each having a capacity of 120 MW.

ÅF's services:

  • Initial project review;
  • Preparation of detailed project report;
  • Training and transfer of knowledge.