This website uses cookies to improve your browsing experience and the continued use of the webpage indicates your consent to ÅF’s use of these cookies. Find out more about how ÅF uses cookies and how you can manage them here: Read more

Menu
Reference

Lago Bianco Dams

Heightening of 2 existing gravity dams in Switzerland

Description of project:

Heightening of 2 existing gravity dams in Switzerland by 4.5 m.
North dam: Raising by placing of concrete on the existing dam crest and building an embankment dam with an impermeable core using fill from tunnel excavations.
South dam: Raising by placing of concrete buttressing on the upstream side, and the placement of concrete on the crest of the dam. Re-design of spillway in accordance with predefined guidelines.

ÅF's services:

  • Pre-feasibility
  • Feasibility
  • Basic design
  • Tender design
  • Hydraulic analysis
  • Hydrological assessment.

More on the same topic

Show more