This website uses cookies to improve your browsing experience and the continued use of the webpage indicates your consent to ÅF’s use of these cookies. Find out more about how ÅF uses cookies and how you can manage them here: Read more

Menu
downunder_gbg_1280x456.jpg
Reference

ÅF takes Gothenburg down-under

ÅF to play major role in West Link, one of Sweden's largest infrastructure projects.

The West Link will facilitate travel for all of western Sweden. The new infrastructure project in Gothenburg is an 8 km long railway, of which 6 km is laid in a tunnel under central Gothenburg, that will provide cross-city commuter rail services. Thanks to three new stations, transit users will be able to travel more conveniently, faster and with fewer transfers. The double track railway and several new stations will make it possible to increase train frequently, shorten travel times and reach more destinations without changes.

ÅF is the responsible technical consultant for the West Link and the assignment includes detailed engineering and preparation of tender enquiry documents for the entire project. The assignment presents several geotechnical challenges. Gothenburg is built on layers of clay and sand, which makes the tunnel construction problematic.

To assist in the assignment, ÅF has engaged the Swiss engineering and consultancy company Basler Hofmann, which has developed a technology for advanced tunnel boring. ÅF has been previously responsible for preparation of railway plans and system documents for the Korsvägen railway station sub-project in the West Link project.

More on the same topic

Show more