New 220/65 kV Substation Creux de Chippis, Switzerland

New 220/65 kV Substation Creux de Chippis, Switzerland

New 220/65 kV Substation Creux de Chippis, Switzerland

Description of project
Replacement of an existing outdoor substation. New GIS indoor substation close to the existing one with minimum adaptations for the connected lines. Consideration of future extension to 380 kV.

Our services
From feasibility study to commissioning. Close cooperation with authorities and environmental associations to achieve an optimized technical solution and necessary permits in a short period of time.