Change language to English Sprache ändern in Deutsch
Share |

Assistance in large-scale integration of wind power into the transmission grid, Turkey

Assistance in large-scale integration of wind power into the transmission grid, Turkey

Assistance in large-scale integration of wind power into the transmission grid, Turkey

Description of Project
Assessment of the need for and conceptual design of modern grid management approaches, aimed at assisting the Turkish TSO (TEIAS) in integrating substantial amounts of intermittent renewable generation, especially wind power (target: 20.000 MW by 2020).

Our services
Identification of TEIAS needs for the integration of wind farms to existing SCADA/EMS. Recommendations for structuring the network development process. Review of technical and non-technical barriers to the adoption of an Actively Managed Automated Grid.

Assistance in large-scale integration of wind power into the transmission grid, Turkey

Jorge Colomer Sanchez
Commercial Director, Energy, Spain

+34 670 315 679
Tel: +46 10 505 00 00 Addresses
Innovation by experience