Reference

Due diligence of a 400 KV transmission line

Feasibility studies for substations and transmission lines in Jordan

ÅF's services: 

  • Technical & eco-fin feasibility study on the reinforcement of the high voltage, south-north transmission corridor, analyzing alternative strategies and technologies, and recommending the most appropriate solutions.
  • Interconnection requirements within the national and regional electricity networks.
  • Preparation of the Project implementation, cost estimates, time phases for the works, procurement plan, preparation of design and engineering documents and preparation of tender documents to allow an open international bidding.